中文版 | English 
Home Company News Products Cases Service Feedback Contact
 
 
  Product Categories
  · The desulfurization circulating p...
  · The desulfurization circulating p...
  · What ZJ had series slurry pump
  · ZJL series liquid slurry pump
  · The HS modification (AH) series s...
  · (R) VS liquid slurry pump under m...
  · ZGB model series slurry pump
  · TS (TSH) series gravel pump
  · WN series dredging pump
  · TL (R) series desulphurization pu...
  · AF series foam pump
  · SX series double suction pump
 
  Contact Us
Tel:0311-67266522
Fax:0311-67693296
Phone:15511361821
E-mail:Sjzzs_heb@126.com
2190346654@qq.com
Manager:yongli zhang . The managerang
Online Service
欢迎用QQ联系我们! 欢迎用MSN与我联系!
 
News Current Location:  Home >> News  【 Return 】  
Slurry pump commissioning procedures
Author:Shijiazhuang Zurish Industry Pump Co., Ltd  Time:2014-06-26 09:28:39  Visits:794  

, before the start of preparing                                1, determine steering: ensure the separation of motor and pump, motor running, to determine whether to correct, otherwise it will cause slurry pump serious damage, motor burn down. The motor is usually three phase four wire system. If the reversal, among them any two wire switch, motor can form forward like that. 

2, check the import and export practice in good condition, do you have any running blockage, pumps and accessories line leak. 

3, pump when it starts to shut down exports, not full rotation torque is too big, otherwise the pump may damage, motor also because of excessive current easily destroyed. 

4 import practice, open, open the discharge valve to make liquid fills the pump cavity, then close vent valve. 

5, for water pump mechanical seal, application of hand plate acting pump rotor so that the lubricant into the mechanical seal face. Avoid mechanical seal when starting dry milling machine seal damage. 

6, manual turning: rotor parts should be flexible rotation, no jam, friction phenomenon. 

, the startup and operation 

1, again check valve fully open, shut off the pipeline valves. 

2, connect the power supply, when the pump reaches the normal speed, then gradually open the valves on the discharge pipe, pay attention to close the valve operating time shall not exceed 5 minutes. Otherwise, bearing, mechanical seal damage easily. 

3, operating conditions for operation within the scope of the manual use, as far as possible close to the design point. Due to traffic and power generally can't see, so to adjust pressure (= water pump outlet pressure, inlet pressure head) and current within the rated. 

4, check the shaft seal: mechanical seal: 10 drops/min Packing: 1 ~ 2 drops per second If more than standard, should handle in time. 

5, check the vibration and noise. 

, parking 

1, gradually close the export pipeline valves, cut off power supply. 

2, such as environmental temperature is below zero degrees Celsius, should put the liquid is put inside the pump, so as to avoid freezing. 

3, such as stopping for a long time, pump should be disassembled to clean and packaging. 

 
 
All Rights Reserved:Shijiazhuang Zunsheng Pump Co.,Ltd (C) Http://www.sjzzunsheng.com
Tel:0311-67266522    Fax:0311-67693296    E_Mail:Sjzzs_heb@126.com
Add:Changan district of shijiazhuang in hebei province Tangu east city gold Ruicheng C2-1-1902    冀ICP备13018851号-1    By:Sjznet.net