中文版 | English 
Home Company News Products Cases Service Feedback Contact
 
 
  Product Categories
  · The desulfurization circulating p...
  · The desulfurization circulating p...
  · What ZJ had series slurry pump
  · ZJL series liquid slurry pump
  · The HS modification (AH) series s...
  · (R) VS liquid slurry pump under m...
  · ZGB model series slurry pump
  · TS (TSH) series gravel pump
  · WN series dredging pump
  · TL (R) series desulphurization pu...
  · AF series foam pump
  · SX series double suction pump
 
  Contact Us
Tel:0311-67266522
Fax:0311-67693296
Phone:15511361821
E-mail:Sjzzs_heb@126.com
2190346654@qq.com
Manager:yongli zhang . The managerang
Online Service
欢迎用QQ联系我们! 欢迎用MSN与我联系!
 
News Current Location:  Home >> News  【 Return 】  
Pump for the cause and the treatment measures (2)
Author:Shijiazhuang Zurish Industry Pump Co., Ltd  Time:2015-03-08 08:49:19  Visits:1200  

Foundation: 

, unstable resonant. 1, the inspection method, the conditions, characteristics: A, although the amplitude than bearing shafting vibration amplitude of the small, but there is A big shock to spread foundation, to the column, beam near it sharply reduced; B, basic vibration frequency and the vibration of the pump speed is consistent; C, adjacent pump equipment operation to a halt when the vibration of the pump is very big. 2, the measures: A, reinforce the foundation; B, improve the balance of a pump. 

, the foundation is not solid cause resonance. 1, the inspection method, the conditions, characteristics: A, although the amplitude than bearing shafting vibration amplitude of the small, but there is A big shock to spread foundation; B, the foundation of vibration frequency is consistent with the pump rotation speed; C, the foundation is not solid. 2, the measures: A, reinforce the foundation; B, to the inside foundation into cement mortar; C, improve the balance of a pump. 

, anchor bolt looseness, or anchor bolt without effective work. 1, the inspection method, the conditions, characteristics: A, vibration is smaller than the vibration of the shaft system, etc, but also have considerable transmission of vibration to the ground; B, cracks on the basis of near the anchor bolt. 2, the measures: A, reinforce the anchor bolt. B, reinforced concrete foundation; C, to increase the number of anchor bolt. 

 
 
All Rights Reserved:Shijiazhuang Zunsheng Pump Co.,Ltd (C) Http://www.sjzzunsheng.com
Tel:0311-67266522    Fax:0311-67693296    E_Mail:Sjzzs_heb@126.com
Add:Changan district of shijiazhuang in hebei province Tangu east city gold Ruicheng C2-1-1902    冀ICP备13018851号-1    By:Sjznet.net