中文版 | English 
Home Company News Products Cases Service Feedback Contact
 
 
  Product Categories
  · The desulfurization circulating p...
  · The desulfurization circulating p...
  · What ZJ had series slurry pump
  · ZJL series liquid slurry pump
  · The HS modification (AH) series s...
  · (R) VS liquid slurry pump under m...
  · ZGB model series slurry pump
  · TS (TSH) series gravel pump
  · WN series dredging pump
  · TL (R) series desulphurization pu...
  · AF series foam pump
  · SX series double suction pump
 
  Contact Us
Tel:0311-67266522
Fax:0311-67693296
Phone:15511361821
E-mail:Sjzzs_heb@126.com
2190346654@qq.com
Manager:yongli zhang . The managerang
Online Service
欢迎用QQ联系我们! 欢迎用MSN与我联系!
 
News Current Location:  Home >> News  【 Return 】  
Pump vibration causes and treatment measures (一)
Author:Shijiazhuang Zurish Industry Pump Co., Ltd  Time:2015-02-25 10:46:25  Visits:1150  

Bad installation: 

Reason : poor assembly and eccentric foundation. A, check method, the conditions and characteristics: 1, check the concentricity of coupling; 2, to check whether there is crack and pump concrete buildings; 3, check the pump foundation for uneven subsidence, seismic shock caused by the eccentric phenomenon. B, measures: readjust the shaft center. 

Reason not when running, the concentricity is good, and appear eccentric during operation. A, inspection method, the conditions and characteristics: 1, the pump discharge side has telescopic joint, when the pump is running, whether the coupling has A lot to move; 2, support the concrete of the discharge pipe for crack; 3, whether mobile pump operation foundation; 4, when the pump is running, there is a lot of water gushed out from the packing, or with air suction; 5, pump just a stop, whether there are eccentric shaft (high temperature liquid). B, measures: 1, changing the structure of the coupling; 2, install in telescopic coupling activities connected to the control of bolts, the mobile does not affect the pump; 3, the head of road was enclosed with concrete, unable to move. 

Reason : flange flexible coupling of uneven or rubber pieces of rubber. A, check method, the conditions and characteristics: 1, check whether coupling bolt diameter of rubber one uniform; 2, the coupling bolt rubber parts is too thick, difficult to insert coupling; 3, the coupling bolt rubber parts is too long, after insert coupling, tighten the nut and compressed rubber parts, rubber parts in the state in which it is difficult to insert. B, measures: 1, choose coupling bolt rubber parts, size is appropriate. 

 
 
All Rights Reserved:Shijiazhuang Zunsheng Pump Co.,Ltd (C) Http://www.sjzzunsheng.com
Tel:0311-67266522    Fax:0311-67693296    E_Mail:Sjzzs_heb@126.com
Add:Changan district of shijiazhuang in hebei province Tangu east city gold Ruicheng C2-1-1902    冀ICP备13018851号-1    By:Sjznet.net