中文版 | English 
Home Company News Products Cases Service Feedback Contact
 
 
  Product Categories
  · The desulfurization circulating p...
  · The desulfurization circulating p...
  · What ZJ had series slurry pump
  · ZJL series liquid slurry pump
  · The HS modification (AH) series s...
  · (R) VS liquid slurry pump under m...
  · ZGB model series slurry pump
  · TS (TSH) series gravel pump
  · WN series dredging pump
  · TL (R) series desulphurization pu...
  · AF series foam pump
  · SX series double suction pump
 
  Contact Us
Tel:0311-67266522
Fax:0311-67693296
Phone:15511361821
E-mail:Sjzzs_heb@126.com
2190346654@qq.com
Manager:yongli zhang . The managerang
Online Service
欢迎用QQ联系我们! 欢迎用MSN与我联系!
 
News Current Location:  Home >> News  【 Return 】  
Slurry pump in use process should pay attention to the problem
Author:Shijiazhuang Zurish Industry Pump Co., Ltd  Time:2015-07-03 15:46:22  Visits:844  

Slurry pump in use process should pay attention to the problems are many, but according to the standardized operation can significantly increase the service life of the slurry pump, prevent the occurrence of accidents, reduce the damage, so as to reduce running cost. 

    1,In the running of pump, in addition to monitoring flow, pressure, also monitor motor do not exceed rated current; Whether at any time to check the oil seal and bearing guide often occur; Pump whether fit or overflow phenomenon such as pool, and processing at any time.   

    2, Before the shipment of slag pulp pumps should open the inlet valve of the pump, close the outlet valve of the pump, and then start the pump. Pump starts slowly again to start the pump outlet valve, pump outlet valve opening size and speed, should be to exceed constant current pump and motor vibration not standard.    

    3,Dredging pump mainly for the purpose of conveying flow, so the best mount flowmeter in running monitoring system (meter), to monitor the flow meets the requirements; In line with cyclone system, cinder flushing system, pressure filtration dehydration system also requires pipe has a certain pressure at the exit. So, in this kind of system should also be fitted with a pressure gauge to monitor the pressure is in line with the requirements. 

    4, Dredging series pump start-up, also follow the above method. Just after the opening level of pump, the level at the end of the pump outlet valve can be opened a little (open the size of the first pump motor current should be a quarter of the rated current), and then can be successively started secondary level 3 until the end of the class, all series pump starts, you can gradually open at the end of the big stage pump outlet valve and the size of the valve opening speed, should with pump vibration and not as a primary pump motors are not excess current to master. 

    In strict accordance with the above specification operation, can avoid artificial damage, increase the service life of the slurry pump accessories. 

 
 
All Rights Reserved:Shijiazhuang Zunsheng Pump Co.,Ltd (C) Http://www.sjzzunsheng.com
Tel:0311-67266522    Fax:0311-67693296    E_Mail:Sjzzs_heb@126.com
Add:Changan district of shijiazhuang in hebei province Tangu east city gold Ruicheng C2-1-1902    冀ICP备13018851号-1    By:Sjznet.net